{"id":16794,"date":"2026-04-07T18:47:14","date_gmt":"2026-04-07T16:47:14","guid":{"rendered":"https:\/\/filter.eu\/laika-kapsula-nakotnei-gren-slokas\/"},"modified":"2026-04-07T18:50:53","modified_gmt":"2026-04-07T16:50:53","slug":"laika-kapsula-nakotnei-gren-slokas","status":"publish","type":"post","link":"https:\/\/filter.eu\/pl\/laika-kapsula-nakotnei-gren-slokas\/","title":{"rendered":"Foundation stone laid for 50 MW biomass boiler plant in Salaspils, Latvia"},"content":{"rendered":"\n<p>On March 27, 2026, the energy company \u201cGren\u201d held a symbolic foundation stone ceremony in Salaspils Municipality for a new, high-efficiency 50 MW woodchip boiler plant. During the event, a time capsule containing a message for future generations was placed in the building\u2019s foundations \u2013 a symbolic testament to what we are building today for the sake of the future.<\/p>\n\n\n\n<p>This project represents a significant investment in the development of Riga\u2019s district heating system, promoting the transition to local and renewable energy resources. The new boiler plant will help reduce dependence on imported fossil fuels while improving the security and stability of heat supply.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2560\" height=\"1707\" src=\"https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/laika-kapsula-gren-slokas-1.jpg\" alt=\"\" class=\"wp-image-16754\" srcset=\"https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/laika-kapsula-gren-slokas-1.jpg 2560w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/laika-kapsula-gren-slokas-1-1024x683.jpg 1024w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/laika-kapsula-gren-slokas-1-768x512.jpg 768w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/laika-kapsula-gren-slokas-1-1536x1024.jpg 1536w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/laika-kapsula-gren-slokas-1-2048x1366.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><figcaption class=\"wp-element-caption\">RIGA, LATVIA. 27.03.2026. Ceremonial embedding of the time capsule during the construction of Gren\u2019s 50 MW biomass boiler plant.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>FILTER\u2019s role in the project<\/strong><\/h2>\n\n\n\n<p>FILTER is one of the key partners in the implementation of this project. The company provides a full cycle of solutions \u2013 from design to the supply of technological equipment, construction coordination, and commissioning.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Technology and future outlook<\/strong><\/h2>\n\n\n\n<p>The new boiler plant will be equipped with two 20 MW woodchip boilers and 5 MW flue gas condensers, resulting in a total installed capacity of 50 MW<em> <\/em>and<em> <\/em>ensuring high efficiency and minimal environmental impact. This technological solution ensures high fuel efficiency and minimal environmental impact, using state-of-the-art emission control technologies.<\/p>\n\n\n\n<p>The commissioning of the boiler plant is planned for spring 2027.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>A message to the future<\/strong><\/h2>\n\n\n\n<p>The placement of the time capsule in this project symbolizes more than just the start of construction \u2013 it is a story of responsibility, sustainability, and vision for the future.<\/p>\n\n\n\n<p><strong>We build for the future \u2014 and leave it our message as well.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2048\" height=\"1365\" src=\"https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_230.jpg\" alt=\"\" class=\"wp-image-16766\" srcset=\"https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_230.jpg 2048w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_230-1024x683.jpg 1024w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_230-768x512.jpg 768w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_230-1536x1024.jpg 1536w\" sizes=\"(max-width: 2048px) 100vw, 2048px\" \/><figcaption class=\"wp-element-caption\">RIGA, LATVIA. 27.03.2026. Ceremonial embedding of the time capsule during the construction of Gren\u2019s 50 MW biomass boiler plant.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2048\" height=\"1365\" src=\"https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_17-1.jpg\" alt=\"\" class=\"wp-image-16784\" srcset=\"https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_17-1.jpg 2048w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_17-1-1024x683.jpg 1024w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_17-1-768x512.jpg 768w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_17-1-1536x1024.jpg 1536w\" sizes=\"(max-width: 2048px) 100vw, 2048px\" \/><figcaption class=\"wp-element-caption\">RIGA, LATVIA. 27.03.2026. Ceremonial embedding of the time capsule during the construction of Gren\u2019s 50 MW biomass boiler plant.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2048\" height=\"1365\" src=\"https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_258.jpg\" alt=\"\" class=\"wp-image-16772\" srcset=\"https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_258.jpg 2048w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_258-1024x683.jpg 1024w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_258-768x512.jpg 768w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/20260327_gren_kapsula_258-1536x1024.jpg 1536w\" sizes=\"(max-width: 2048px) 100vw, 2048px\" \/><figcaption class=\"wp-element-caption\">RIGA, LATVIA. 27.03.2026. Ceremonial embedding of the time capsule during the construction of Gren\u2019s 50 MW biomass boiler plant.<\/figcaption><\/figure>\n\n\n\n<p>The use of sustainable woodchips in energy production strengthens Latvia\u2019s energy independence, reduces reliance on imported energy resources, supports local economic development and helps stabilise heat prices in the long term, ensuring a reliable heat supply for residents and businesses in Riga. To make energy not only greener but also more affordable.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2560\" height=\"1707\" src=\"https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/gren-slokas_50-mw-skeldas-katlu-maja_vizualizacija-1-1.jpg\" alt=\"\" class=\"wp-image-16778\" srcset=\"https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/gren-slokas_50-mw-skeldas-katlu-maja_vizualizacija-1-1.jpg 2560w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/gren-slokas_50-mw-skeldas-katlu-maja_vizualizacija-1-1-1024x683.jpg 1024w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/gren-slokas_50-mw-skeldas-katlu-maja_vizualizacija-1-1-768x512.jpg 768w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/gren-slokas_50-mw-skeldas-katlu-maja_vizualizacija-1-1-1536x1024.jpg 1536w, https:\/\/filter.eu\/wp-content\/uploads\/2026\/04\/gren-slokas_50-mw-skeldas-katlu-maja_vizualizacija-1-1-2048x1366.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n\n<p>The significance of the project for Latvia\u2019s energy sector has also been reported by leading media outlets, including Dienas Bizness and TVNET, highlighting the scale of investment and the transition to renewable resources.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><em>Dienas Bizness:<\/em> <a href=\"https:\/\/www.db.lv\/zinas\/jaunas-skeldas-katlumajas-salaspili-buvnieciba-gren-investes-vairak-neka-30-miljonus-eiro-525794\" data-type=\"link\" data-id=\"https:\/\/www.db.lv\/zinas\/jaunas-skeldas-katlumajas-salaspili-buvnieciba-gren-investes-vairak-neka-30-miljonus-eiro-525794\">Gren will invest more than \u20ac30 million in the new woodchip boiler plant<\/a><\/li>\n\n\n\n<li><em>TVNET:<\/em> <a href=\"https:\/\/www.tvnet.lv\/8442047\/salaspili-top-jauna-skeldas-katlumaja-ar-vairak-neka-30-miljonu-eiro-investicijam\" data-type=\"link\" data-id=\"https:\/\/www.tvnet.lv\/8442047\/salaspili-top-jauna-skeldas-katlumaja-ar-vairak-neka-30-miljonu-eiro-investicijam\">A new boiler plant with investments exceeding \u20ac30 million is being built in Salaspils<\/a><\/li>\n\n\n\n<li><em>BLBS:<\/em> <a href=\"https:\/\/blbs.lv\/jaunumi\/ieliek-pamatakmeni-50-mw-skeldas-katlu-majai-salaspils-novada\/\" data-type=\"link\" data-id=\"https:\/\/blbs.lv\/jaunumi\/ieliek-pamatakmeni-50-mw-skeldas-katlu-majai-salaspils-novada\/\">Industry news about the foundation stone ceremony<\/a><\/li>\n<\/ul>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On March 27, 2026, the energy company \u201cGren\u201d held a symbolic foundation stone ceremony in Salaspils Municipality for a new, high-efficiency 50 MW woodchip boiler plant. During the event, a time capsule containing a message for future generations was placed in the building\u2019s foundations \u2013 a symbolic testament to what we are building today for [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":16624,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[53],"tags":[594,595,596,597],"solution_type":[],"class_list":["post-16794","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aktualnosci","tag-biomass-boiler-plant","tag-biomass-energy","tag-district-heating","tag-renewable-energy"],"acf":[],"_links":{"self":[{"href":"https:\/\/filter.eu\/pl\/wp-json\/wp\/v2\/posts\/16794","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/filter.eu\/pl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/filter.eu\/pl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/filter.eu\/pl\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/filter.eu\/pl\/wp-json\/wp\/v2\/comments?post=16794"}],"version-history":[{"count":1,"href":"https:\/\/filter.eu\/pl\/wp-json\/wp\/v2\/posts\/16794\/revisions"}],"predecessor-version":[{"id":16798,"href":"https:\/\/filter.eu\/pl\/wp-json\/wp\/v2\/posts\/16794\/revisions\/16798"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/filter.eu\/pl\/wp-json\/wp\/v2\/media\/16624"}],"wp:attachment":[{"href":"https:\/\/filter.eu\/pl\/wp-json\/wp\/v2\/media?parent=16794"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/filter.eu\/pl\/wp-json\/wp\/v2\/categories?post=16794"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/filter.eu\/pl\/wp-json\/wp\/v2\/tags?post=16794"},{"taxonomy":"solution_type","embeddable":true,"href":"https:\/\/filter.eu\/pl\/wp-json\/wp\/v2\/solution_type?post=16794"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}