2.0 MW + 0.5 MW modular biomass boiler plant: delivery, installation and commissioning

2.0 MW + 0.5 MW modular biomass boiler plant: delivery, installation and commissioning
Metai 2023
Vieta Latvia
Industrija
  • Energijos gamyba ir galios generavimas
Paslaugos
  • Įrangos montavimas ir paleidimas, 
  • Projektavimas ir inžinerija, 
  • Automatika
Sprendimai
  • Katilinės
Produktai
  • Vandens šildymo katilai, 
  • Šilumokaičiai, 
  • Degikliai, 
  • Matavimo įranga, 
  • Siurbliai, 
  • Sklendės ir kita vamzdyno įranga

Enhancing heating efficiency: the comprehensive FILTER project

FILTER project, which combines both emergency and basic load capacities with a modular design-type boiler house, guarantees uninterrupted and efficient heating. This initiative translates into cost savings, reduced environmental impact, and a dependable energy source for the community.

The scope of the FILTER project encompasses:

  • Designing, delivering, and supervising a 2.0 MW + 0.5 MW modular boiler plant
  • Installation of a 200 m3 fuel storage facility
  • Installing water heating biomass boiler (2.0 MW) to handle the basic load during the heating period,
  • Providing another modular solution with one water heating biomass boiler (0.5 MW) for emergencies, summer periods, and hot water preparation
  • Integration of a flue gas Electrostatic Precipitator (ESP) with ash unloading containers
  • Seamless integration into the local district heating system,
  • Ensuring the boiler house is fully automatic without the need for permanent personnel on-site
  • 2.5 MW Thermal output total
  • 200 m3 Fuel storage facility
  • ESP Electrostatic precipitator
Raskite artimiausią biurą ir susisiekite su mumis Mes padėsime jums rasti geriausią sprendimą.

Šviežiausios naujienos ir tinklaraščio įrašai

Žiūrėti visus įrašus

Contact us

This field is for validation purposes and should be left unchanged.