2.0 MW + 0.5 MW modular biomass boiler plant: delivery, installation and commissioning

2.0 MW + 0.5 MW modular biomass boiler plant: delivery, installation and commissioning
Metai 2023
Vieta Latvia
Industrija
  • Energijos gamyba ir galios generavimas
Paslaugos
  • Įrangos montavimas ir paleidimas, 
  • Projektavimas ir inžinerija, 
  • Automatika
Sprendimai
  • Katilinės
Produktai
  • Vandens šildymo katilai, 
  • Šilumokaičiai, 
  • Degikliai, 
  • Matavimo įranga, 
  • Siurbliai, 
  • Sklendės ir kita vamzdyno įranga

Enhancing heating efficiency: the comprehensive FILTER project

FILTER project, which combines both emergency and basic load capacities with a modular design-type boiler house, guarantees uninterrupted and efficient heating. This initiative translates into cost savings, reduced environmental impact, and a dependable energy source for the community.

The scope of the FILTER project encompasses:

  • Designing, delivering, and supervising a 2.0 MW + 0.5 MW modular boiler plant
  • Installation of a 200 m3 fuel storage facility
  • Installing water heating biomass boiler (2.0 MW) to handle the basic load during the heating period,
  • Providing another modular solution with one water heating biomass boiler (0.5 MW) for emergencies, summer periods, and hot water preparation
  • Integration of a flue gas Electrostatic Precipitator (ESP) with ash unloading containers
  • Seamless integration into the local district heating system,
  • Ensuring the boiler house is fully automatic without the need for permanent personnel on-site
  • 2.5 MW Thermal output total
  • 200 m3 Fuel storage facility
  • ESP Electrostatic precipitator
Raskite artimiausią biurą ir susisiekite su mumis Mes padėsime jums rasti geriausią sprendimą.

Contact us

This field is for validation purposes and should be left unchanged.