The technical solution for the modernization project involves the reconstruction of a fully automated biomass boiler house with a total capacity of 3 MW. This initiative includes the construction of a biomass boiler warehouse equipped with moving floors for efficient unloading and storage of biomass, and a biomass supply system utilizing hydraulic pushers. To ensure compliance with legislative purity standards, an electrostatic precipitator (ESP) has been installed, along with chimneys for flue gas discharge. Additionally, water preparation systems have been integrated into the facility. Operating in automatic mode, the biofuel boiler house does not require permanent on-site personnel. Control and monitoring are managed from the boiler house control room console, which provides remote notifications to operators regarding work parameters, errors, or emergency situations, thus ensuring efficient and reliable operation.
![Reconstruction of biomass boiler house 3 MW](https://filter.eu/wp-content/uploads/2024/02/MG_6781.jpg)