2.0 MW + 0.5 MW modular biomass boiler plant: delivery, installation and commissioning

2.0 MW + 0.5 MW modular biomass boiler plant: delivery, installation and commissioning
Gads 2023
Valsts Latvia
Industrija
  • Enerģētikas nozare
Pakalpojumi
  • Iekārtu uzstādīšana un iedarbināšana, 
  • Projektēšanas pakalpojumi, 
  • Automātikas risinājumi
Risinājumi
  • Industriālās katlu mājas un katlu iekārtas
Produkti
  • Karstā ūdens apkures katli, 
  • Siltummaiņi, 
  • Degļi, 
  • Rūpniecisko procesu instrumentācija, 
  • Sūkņi, 
  • Vārsti un cauruļvadu armatūra

Enhancing heating efficiency: the comprehensive FILTER project

FILTER project, which combines both emergency and basic load capacities with a modular design-type boiler house, guarantees uninterrupted and efficient heating. This initiative translates into cost savings, reduced environmental impact, and a dependable energy source for the community.

The scope of the FILTER project encompasses:

  • Designing, delivering, and supervising a 2.0 MW + 0.5 MW modular boiler plant
  • Installation of a 200 m3 fuel storage facility
  • Installing water heating biomass boiler (2.0 MW) to handle the basic load during the heating period,
  • Providing another modular solution with one water heating biomass boiler (0.5 MW) for emergencies, summer periods, and hot water preparation
  • Integration of a flue gas Electrostatic Precipitator (ESP) with ash unloading containers
  • Seamless integration into the local district heating system,
  • Ensuring the boiler house is fully automatic without the need for permanent personnel on-site
  • 2.5 MW Thermal output total
  • 200 m3 Fuel storage facility
  • ESP Electrostatic precipitator