    Installation of wastewater treatment plant

    Installation of wastewater treatment plant
    Aasta 2021
    Asukoht Latvia
    Tööstus
    • Energia ja elektritootmine, 
    • Munitsipaal
    Teenused
    • Insenerlahendused ja projekteerimine, 
    • Paigaldamine ja kasutuselevõtt, 
    • Automatiseerimine
    Lahendused
    • Veetöötluslahendused
    Tooted
    • Veetöötlusseadmed

    Installation of wastewater treatment plant for municipal heat supply company

    The project focuses on the regeneration of Combined Heat and Power (CHP) Wastewater Treatment Plant (WTP) rinsing water. The rinsing water, collected in an 8m³ tank, is treated using a reverse osmosis filter system to recover at least 70% of the wastewater, which would otherwise be discharged into the sewage system. Key equipment include automatic pressure filters (sand filters), week acid  exchanger  (dealkalizer), neutrolizer, CO2 remover, 2 x booster pump station, automatic softeners, pre-filter with filter bag, reverse osmosis equipment, dosing, CIP unit and brine maker unit with NaCL storage. This FILTER solution aims to significantly reduce wastewater disposal while enhancing resource efficiency in the municipal heat supply sector. The system not only helps in water conservation but also improves the overall environmental impact of the CHP plant.

    • 2,4 m3/h output
    • 8m³ tank
    • 70% wastewater recovery