FREE CONSULTATION

Drop files here or
Accepted file types: pdf, doc, docx, xls, xlsx, Max. file size: 50 MB.
    This field is for validation purposes and should be left unchanged.

    Reconstruction of heating system for the wood processing facility

    Reconstruction of heating system for the wood processing facility
    Year 2021
    Location Latvia
    Industry
    • Wood & Construction
    Services
    • Installation and commissioning, 
    • Automation, 
    • Design & Engineering
    Solutions
    • Heat exchanger solutions, 
    • Pumping solutions and pumps, 
    • Industrial boiler houses and plants
    Products
    • Heat exchangers, 
    • Pumps

    Reconstruction of heating system for the wood processing facility

    This project involves the reconstruction of the existing boiler house and heating system for a wood processing/sawmill facility, with a focus on distributing heating capacity between multiple consumers and implementing full process automation. The goal is to enhance the efficiency and flexibility of the heating system while ensuring smooth and automated operation across all connected systems. Key equipment includes 3 x circulating pumps, 3 x frequency converters, heat exchanger 10 MW, hydraulic separator, valves, strainers, expansion joints, expansion tanks, insulation jackets for main pipelines and equipment. The entire process is automated, with real-time control and visualization of all system processes, ensuring optimal performance and easy monitoring. This reconstruction project modernized the heating infrastructure, increased energy efficiency, and enabled full automation of the system, leading to better performance, lower operating costs, and increased reliability for the wood processing facility.

    Find your nearest office and get in touch. We will be happy to help you find the best solution.

    Latest blog posts

    View all posts