New deaerator solution and reconstruction of existing boiler plant

New deaerator solution and reconstruction of existing boiler plant
Gads 2018
Valsts Estonia
Industrija
  • Pārtikas rūpniecība
Pakalpojumi
  • Projektēšanas pakalpojumi, 
  • Iekārtu uzstādīšana un iedarbināšana, 
  • Iekārtu serviss un apkopes
Risinājumi
  • Tvaika un kondensāta sistēmas, 
  • Barošanas ūdens tvertnes/deaeratoru risinājumi, 
  • Siltummaiņu risinājumi
Produkti
  • Sūkņi, 
  • Vārsti un cauruļvadu armatūra, 
  • Siltummaiņi

Deaerator solution for steam boiler optimization

A comprehensive solution was implemented for steam boiler optimization, encompassing multiple aspects. Firstly, a new feedwater tank (1,5 m3) with chemical dosing pump and a complete regulation and armature set was installed. Construction of a steam collector involved separating steam consumers, providing each with an individual shut-off valve, and incorporating an electric drive on the CIP steam consumer. Piping and existing heat transfer units, including CIP and calorifier heater, underwent reconstruction for enhanced functionality. To monitor water quality, a boiler water sampling point was strategically installed. Furthermore, the boiler feedwater pump was replaced, contributing to overall system reliability and performance. At the same time steam boiler, its blowdown system and burner was kept existing. This integrated approach addressed various elements crucial for efficient steam boiler operation and maintenance.

  • 1500 kg/h Deaerator capacity
Atrodi tuvāko biroju un sazinies. Mēs ar prieku palīdzēsim rast risinājumu jūsu problēmām.

Contact us

This field is for validation purposes and should be left unchanged.