FREE CONSULTATION

Drop files here or
Accepted file types: pdf, doc, docx, xls, xlsx, Max. file size: 50 MB.
    This field is for validation purposes and should be left unchanged.

    Installation of a 5000 kg/h steam boiler with factory heating substation

    Installation of a 5000 kg/h steam boiler with factory heating substation
    Year 2024
    Location Lithuania
    Industry
    • Food & Beverages
    Services
    • Design & Engineering, 
    • Installation and commissioning, 
    • Maintenance and after sales service
    Solutions
    • Industrial boiler houses and plants, 
    • Steam and condensate systems, 
    • Heat exchanger solutions
    Products
    • Pumps, 
    • Burners

    Efficient steam and heating solution for food & beverages Industry

    In our recent project for a food and beverages company, we installed a 5000 kg/h steam boiler along with a factory heating substation to support heating and industrial processes. The project scope included:

    • Installation of a high-performance 5000 kg/h steam boiler, designed to generate steam at up to 13 bar of pressure, ensuring optimal performance for both heating and industrial applications.
    • Integration of heat exchanger station to efficiently distribute heat throughout the factory, maximizing energy efficiency and operational reliability.
    • System optimization to meet critical performance parameters, including steam generation capacity, precise temperature control, and enhanced energy efficiency.

    This project solution has advanced the factory’s operational efficiency, providing a reliable steam solution tailored to the client’s specific needs.

    • 13bar Max pressure
    • 5000 kg/h Steam
    Find your nearest office and get in touch. We will be happy to help you find the best solution.

    Latest blog posts

    View all posts