A full-cycle steam supply project was implemented at the client’s pet food production facility, providing a reliable and energy-efficient solution for the production process requirements. Within the scope of the project, the steam boiler and associated equipment were designed, supplied, and installed, followed by commissioning and adjustment of the boiler house.
As part of the project, a Viessmann Vitomax HS steam boiler with a capacity of 2,500 kg/h and operating pressure of 10 bar was delivered and installed, equipped with a gas burner and control system. A complete boiler feed and water treatment system was also installed, including deaeration, feed pumps, water filtration and softening, as well as chemical dosing.
Steam and condensate pipelines were constructed from the boiler house to the production facility, and an insulated chimney was installed. All works were carried out in compliance with applicable regulatory requirements.
As a result, the client obtained a modern, automated, and reliable steam supply system that fully meets current production capacity and quality requirements, as well as future production development plans.