Water supply pumping station equipment reconstruction

Water supply pumping station equipment reconstruction
Year 2025
Location Latvia
Industry
  • Water & Wastewater Treatment
Services
  • Installation and commissioning
Solutions
  • Pumping solutions and pumps
Products
  • Pumps

Water supply pumping station equipment reconstruction

The objective of the project was to design and implement a technical reconstruction solution for a water supply pumping station, improving the stability, safety, and operational reliability of the water distribution system, while ensuring the required flow rates and pressure for residents in high-rise residential areas.

As part of the project, a technical solution for the booster pumping station was developed and the station equipment was reconstructed. The system was equipped with two pressure-boosting pumps, each with a capacity of 50 m³/h at a head of H = 3.5 bar, providing the required performance and operational redundancy.

The reconstruction included full pump piping and valving, installation of shut-off and control valves, and assembly of stainless steel pipelines, integrating the new equipment into the existing water supply system. As a result, the stability and safety of the water supply system were significantly improved, and the overall operational reliability of the pumping station was enhanced.

Find your nearest office and get in touch. We will be happy to help you find the best solution.